Tilbury Douglas has started construction on Beacon Academy in Cleethorpes, part DfE’s Framework, the project will...
Latest posts
-
Tilbury Douglas has started construction on Beacon Academy in Cleethorpes.
-
Metway is working in conjunction with Kier Construction and the Department of Education on the project of St John Vianney Special School.2025-04-23
The school is a replacement for 160 pupils with SEND ( special educational needs & disabilities).
-
Welcome Adam Baxter2025-03-03
We are happy to announce Adam Baxter will join Metway as Wiring Systems Business Development Manager.
-
Welcome Kevin Saunders2025-02-18
We are pleased to be joined by Kevin Saunders as Southern connect Business Development Manager.
-
Metway are happy to announce the recruitment of Paul Davies to the Business Development Team.2024-09-12
Metway are happy to announce the recruitment of Paul Davies to the Business Development Team.
-
Introducing The New MCC Range2024-05-15
Introducing Metway’s innovative Connection Centre lighting control modules.
-
40 years service at Metway2024-03-27
Metway are pleased to congratulate Kevin Stokes – Deputy Warehouse Supervisor for 40 years loyal service.
-
Metway are pleased to announce the appointment of John Mercer and Aarron Ancell to their Wiring Systems Team.2023-11-02
John joins Metway as Product and Technical Dept Manager and brings with him a wealth of knowledge from over 35 years...
-
25 years at Metway2023-09-20
Metway are pleased to congratulate Chris Brown – Internal Business Development Manager and Michael Pumfrey –...
-
Dublin boxer Jay Byrne2023-07-14
This Saturday night, the Vertu Motors Arena in Newcastle will witness the return of Dublin boxer Jay Byrne as he...
Blog categories
Search in blog

Folkestone College
Working with ECO MEP on a newly constructed teaching block at Folkestone College, Metway have designed and supplied a full Dali, plug and play system using the Metway Connection Centre (MCC) and leads with 166 G-type connectors.
Using Bluetooth smart sensors in the training rooms gave full control of the lighting with pre-commission carried out before supplying the equipment, so that full on-site commissioning was not required, saving time and expense.
Through corridors we used microwave sensors to pick up the slightest of movement, while all other rooms used absence or presence photoelectric sensors, depending on the individual need for each area.
Related posts
-
BRIGHTON POLICE STATION
Posted in: Projects2023-05-26Supply and commissioning of fully addressable lighting controls.Read more -
THE RANGE DISTRIBUTION CENTRE – AVONMOUTH
Posted in: Projects2023-05-26Metway have supplied prefabricated leads for probably the largest building in the West Country.Read more -
THE ALDI DISTRIBUTION CENTRE - ISLE OF SHEPPY
Posted in: Projects2023-05-26Metway have supplied and commissioned lighting controls utilising the MCC connection centre and microwave sensors for...Read more -
BOLAND’S COURT - DUBLIN
Posted in: Projects2023-05-26Supply of prefabricated leads for the urban regeneration scheme that repurposes the industrial warehouses of the...Read more -
BBC STUDIOS
Posted in: Projects2023-05-26System: WiringRead more
Leave a comment